References:

1. Wikipedia

2.  Le Tissier, Tony (2009), The Siege of Küstrin, Stackploe Books 

Area B

The German defenses included heavy weapons positions, which could be identified at several locations around the town. The positions were sited to cover roads entering the town (Graphics 5 - 8).   A number of vehicles near the artillery barracks may have been marshalled for the town evacuation, which began on 19 February.  A tank ditch had been excavated at the intersection of two roads south of the citadel at the Kietz gate.  

Area F

The Siege of Küstrin (Kostrzyn) between 31 January and 30 March 1945 opened the way for the Red Army's assault on Berlin.  By 20 February, when the town was imaged by a Luftwaffe reconnaissance sortie, it had already been isolated by enemy bridgeheads to the north and south. The sortie provided good coverage of German defensive preparations and Soviet activity northwest along the Oder, but, likely because of cloud or smoke, the crossings at Kienetz and Gross Neuendorf were apparently not imaged (Map).  The approximately 30 km between Küstrin and the town of Güstebiese (Gozdowice) are depicted in six annotated area mosaics (Areas A - F).  Individual points of interest are shown on a number of graphics (1 - 12), which are noted on the mosaics.  

Further northwest, Soviet activity around the town of Kalenzig (Kalensko) was more pronounced (Area C).  Vacant artillery and anti-aircraft artillery (AAA) positions were the result of earlier activity.  However, the presence of four occupied anti-aircraft sites and at least three deployment areas with an undetermined number of vehicles, presaged not only the establishment of another bridgehead, but the construction of two tactical airfields.  A Luftwaffe target graphic showed the airfields, Kalenzig and Neumuhl (see article Vistula-Oder Operation Graphic 6), may have been completed by 8 March. The area ultimately used for Kalenzig Airfield was bracketed by three of the occupied AAA positions.  It appears Neumuhl was an abandoned German hard-surface airfield project. The target graphic showed the Soviets had improved the center section. 

Graphic 10

Graphic 6

Graphic 1

The Siege of Küstrin and the Oder River Front 

Area D

Graphic 2

Area C

The front line was most evident outside the town of Alt Drewitz where a tank ditch had been excavated across the road, Drewitzer Strasse (Graphics 9 & 10). Trenches and foxholes were on either side of the road.  A building was burning 500m to the northwest along the road.

The great fortress of Küstrin, located at the junction of the Oder and Warthe rivers, was laid down in its final form in 1535.  In 1832, the Vorflut canal was constructed west of the citadel, isolating it and the town's Altstadt on an island.  Later, as the town grew into an important rail junction, the the Neustadt expanded to the right bank of the Warthe. In addition to major rail facilities, the Neustadt contained   a cellulose plant, hospital and the Stülpnagel (infantry) bararcks that became key defensive points.   

The Red Army had not yet crossed the river from Güstebiese (it would be crossed by Polish engineers), but it appeared to have positions on an island (Area F).  Little activity was discernible, although the town was partially enclosed by defensive trenching, possibly left by the departing Wehrmacht.

​​​​On 20 February, trenching and foxholes defined the defensive perimeter around Küstrin, which extended from the town of Blyen on the Oder's left bank, around the cellulose plant, hospital and infantry barracks training area in the Neustadt, and west around the Altstadt to the town of Kietz (Area A, Graphics 1 - 3).  The Neustadt had already been penetrated by the Red Army on 31 January, when an armor company drove unopposed down the Plantagenstrasse. The tanks were stopped at an intersection known as the Stern and four were destroyed after turning around and heading back down the street (Graphic 4).  The image shows several objects in the street, some of which could be the tanks.  

Graphic 7

Graphic 12

Graphic 3

The Soviets would soon establish another crossing point at Zellin (Czelin), but on 20 February, little activity was observed in the town, which showed some evidence of fighting (Area E).  Twelve unoccupied anti-aircraft sites indicated a recent Soviet presence.

Area A

Graphic 9

From Küstrin, the Red Army controlled the Oder riverbanks all the way tto the right bank town of Güstebiese (Gozdowice).  Evidence of the Soviet presence --weapons positions and vehicle trackage-- could clearly be seen around deployment areas north of Alt Drewitz in the vicinity of Alt Schuamberg (Area B).  It was not clear if all these were all occupied on 20 February, but a convoy of five trucks could be seen, probably traveling to Alt Schaumberg (Graphic 11).  A large area of fresh concentrated artillery imapacts could be seen north of Blyen, where the Wehrmacht had staged counterattacks. Two smaller impact areas near Alt Schaumberg and Alt Drewitz suggested limited response from the Wehrmacht.

 

Alt Drewitz was also the site of a major POW camp, STALAG III-C (Graphic 12).  The camp (see separate article), was liberated by the Red Army on 31 January; a small sub-camp was kept at the Cellulose Plant (see Graphic 2).  

Northwest of Kalenzig, little or no ongoing activity was observed between in the vicinity of Kliewitz (Chlewice; Area D).  Unoccupied artillery and anti-aircraft positions and heavy vehicle trackage was probably associated with the river crossing at Kienetz and Gross Neuendorf  (see article Vistula-Oder Operation), a short distance west-northwest across the river.  Kienetz and probably Gross Neuendorf were either cloud covered or obscured by tactical smoke.   

 

Graphic 4

Graphic 4

​​​​​​​​​​​​​​​​WW2 Aerial Reconnaissance Studies 

Graphic 11

Graphic 8

Graphic 5

Area E

Graphic 2